Joseph Price: ASTRON PLASTICS
Steve, you and your team have done a fantastic job. It looks good now and thank you again.
Robert Asplin: 1ST MECHANICAL
We recently sub-contracted the installation of new 100mm diameter chilled water flow and return branches from existing live chilled water main pipes at Auckland Hospital to ABC Pipefitters. The work which required hot tapping, was carried out in a timely manner and included interface with the Hospital maintenance staff, the Main Contractor and an insulation specialist. The work was done to what we see as a high standard and the overall outcome was excellent. We would recommend ABC Pipefitters for this and all other types of pipework installation.
Marty Angliss: PETROLEUM SOLUTIONS
No problems working with you guys again. I have to say your boys have done a good job and made it happen and I would have no hesitation in recommending ABC again to anybody.
Allan Kendrick: HAWKINS
ABC’s crew had a positive attitude towards health and safety while working on the Middlemore CSB. Any safety issues that did arise concerning staff were quickly and efficiently dealt with by Kevin.